Choosing the right deck for your section and climate
A deck is the cheapest extra living space most homes can get, provided the ground, the timber and the fixings are chosen for where it sits.
Timber decks come in more forms than most people expect: a low platform off the living room, a raised deck on piles, a stepped deck down to the lawn, a platform around a spa, or a wrap-around that follows two sides of the house. Each one changes the substructure, the quantity of timber and whether a building consent is needed, which is why we start with the section rather than a catalogue. West Beach Construction builds decks across Upper Hutt, Lower Hutt, Wellington city, Porirua and the Kapiti Coast, and director Ethan Mansell measures and quotes every deck himself.
This page explains the decisions behind a good deck: the type, the timber, the frame underneath, the fixings, the balustrade, drainage and upkeep. For local detail see timber decks in Wellington and decks in Upper Hutt, and read what to consider before you build a deck first.
Call Ethan on 022 621 5980

Deck types we build
A deck is the cheapest extra living space most homes can get, provided the ground, the timber and the fixings are chosen for where it sits.
Ground level decks
Platforms with the surface less than a metre above the ground, on concrete footings and short piles. No balustrade is required and most are exempt from consent, which keeps the job short and puts the cost into timber rather than structure.
Elevated decks
Decks on taller piles over sloping ground or off an upper floor. They carry more load, need bracing, a balustrade and often an engineer, and a surface more than 1.5 metres above the ground needs a building consent.
Multi-level and stepped decks
Two or three platforms linked by wide steps so the deck meets the lawn gradually. A good answer where the house sits well above the garden and one tall deck would feel like a balcony.
Spa, pool and wrap-around decks
Decks framed around a spa pool with removable panels for servicing, and wrap-around decks on two sides of the house so there is somewhere to sit in both morning and afternoon sun.
Timber choices and what each one costs you later
H3.2 treated radiata pine is the most economical decking and the most common. It greys off within a year unless it is oiled. Kwila is the hardwood most often chosen when the budget allows: dense, long lasting and a rich colour when oiled, but it bleeds tannin onto paving for the first few months and needs oiling to hold its colour. Vitex is a paler hardwood that bleeds far less, and garapa sits between the two on price and colour.
Composite decking never needs oiling and does not splinter, which suits a rental or a holiday home, but it costs more per board, gets hotter underfoot and cannot be sanded back if scratched. We lay the options out on the first visit so the choice is yours.
The frame underneath matters more than the boards
A deck that sags or bounces has a substructure problem, not a decking problem. We set piles in concrete footings sized for the soil, run bearers on the piles and joists over the bearers at spacings taken from NZS 3604, so the spans suit the decking and the load. Framing is H3.2 treated pine and anything in the ground is H4.
Fixings are chosen for the exposure zone. Galvanised is fine inland, but near the coast and in the Wellington wind belt we use stainless steel screws and bolts, because corroded fixings are what fail first on a deck. At the house we flash the ledger or stand the deck on its own piles, so water never sits against the cladding.
Balustrades, consent and the two heights that matter
Two measurements decide how much paperwork a deck needs. A surface 1 metre or more above the ground needs a barrier that meets the Building Code: at least 1 metre high, with no gaps a child could fit through or climb. A surface more than 1.5 metres above the ground needs a building consent from your council. Below 1.5 metres the work is exempt under Schedule 1 of the Building Act but must still comply with the Code, which is why we build exempt decks the same way as consented ones.
Balustrade options run from timber posts and rails, to stainless wire, to frameless glass that keeps a view.
Drainage, gaps and looking after the deck
Decking boards are laid with a gap of a few millimetres so water drains through, leaves do not collect and the boards can move with the seasons. Under the deck we grade the ground away from the house and keep the piles clear of soil, because a deck that holds damp underneath rots from below while looking fine on top.
Maintenance depends on the timber. Pine and hardwood decks want a wash and a coat of oil roughly once a year, more often on the north side. A deck left to grey is weathering, not failing, and a clean and a coat of oil brings it back. Composite needs a wash. Keep pot plants on feet, clear the gaps each autumn and check the fixings every couple of years.
Contact us about a timber deck
If you are planning a deck anywhere in the Wellington region, call Ethan on 022 621 5980, email ethan@westbeachconstruction.co.nz or send a few photos and your address through our contact page, Monday to Friday, 7:30am to 5pm. We visit before quoting so the price reflects your ground and levels.
Our timber fences page covers boundary and privacy fencing, and finished decks are in the project gallery.
FAQS
Frequently Asked Questions
Only if the deck surface is more than 1.5 metres above the ground. Lower decks are exempt under Schedule 1 of the Building Act but must still meet the Building Code. We confirm the height on the first visit and manage the consent where one is needed.
Hardwoods such as kwila and vitex outlast treated pine on the surface, and composite outlasts both, but the frame underneath decides the real life of the deck. A well-built H3.2 pine frame on H4 piles with stainless fixings will outlive several sets of boards.
A simple ground level deck is usually a few days to a week on site. Elevated decks with balustrades and steps take longer, and a consented deck adds the council processing time before we can start. We give you a programme with the quote.
Yes. We frame the deck to carry the filled weight of the spa, which is considerable, and build in removable panels so the pump and filter can be reached for servicing without lifting any boards.
Sometimes, with a flashed ledger that keeps water out of the wall. On older weatherboard homes we often build the deck freestanding on its own piles instead, so nothing is bolted through the cladding. We decide this with you on site.
About once a year for pine and hardwood, more often on sun-facing sides. Composite only needs washing. Skipping a year is not a disaster: the timber greys rather than fails, and it can be cleaned and re-oiled later.
Ready to talk about your project? West Beach Construction is here to help.
See what our clients say about our service
Get a quote for a timber deck
Tell us where the deck will go and what you want to use it for. We will visit, check the ground and the levels, and send a written quote that itemises the frame, the decking and the balustrade.