Kitchen Renovators

Kitchen renovators based in Upper Hutt and working across the Wellington region. West Beach Construction does the building side of a new kitchen and works alongside a joiner or the kitchen company you have chosen, so the wall removal, services, linings, installation and fit-off are run by one builder.

Business Hours

Monday - Friday: 7:30am - 5pm

Service Area

Wellington Region

Contact

A kitchen company sells cabinets; a renovator builds the room

Most kitchen projects involve two businesses, and the gap between them is where delays and extra costs usually appear.

Most people pricing a new kitchen visit a showroom first. That gets them a cabinet design and a price for the joinery. What it does not get them is anyone responsible for the wall that has to come out, the floor that is not level, the plumbing that has to move, the linings and painting, or the day the old kitchen goes in a skip. That is the work of a kitchen renovator, and it is the half of the project that goes wrong when nobody owns it. West Beach Construction takes on that half and works with whichever kitchen company or joiner you prefer.

For the options themselves, see our kitchen renovations page. This page is about the roles: who does what, how the measure and template process works, which certificates you should receive and how to compare quotes. See builders in Wellington for the suburbs we cover.

Call Ethan on 022 621 5980

Building a timber paling fence beside a driveway in Upper Hutt

Who does what on a kitchen project

Most kitchen projects involve two businesses, and the gap between them is where delays and extra costs usually appear.

The kitchen company or joiner

Designs and manufactures the cabinetry, and often installs the carcasses and doors. Some also supply the benchtop through a fabricator. Their responsibility usually ends at the edge of the cabinets.

The kitchen renovator

Strips the old kitchen, makes the structural changes, prepares the floor and walls, coordinates the plumber and electrician, lines and paints, installs or oversees the installation, and fits the finishing details.

The plumber and electrician

Licensed trades who rough in before the linings go on and return at the end to connect the sink, dishwasher, hob, oven and rangehood. Their certificates are part of your paperwork.

You

Appliance choices, finishes and timing. A renovator's job is to ask for those decisions early enough that nothing waits on them, and to say plainly when a choice will cost more than it looks.

Working with a joiner, and the measure-and-template process

We have joiners we work with regularly, and we also install kitchens designed by a company you have chosen. Either way the sequence is the same. The joiner measures once the room is stripped and the walls are straight. The cabinets are made and installed, and only once they are fixed and level does the benchtop fabricator come to template, because a stone or laminate top is cut to the cabinets as installed, not as drawn. The top arrives a week or so later and the plumber and electrician fit off after it.

Our part is to have the room ready for each of those visits, so nobody turns up to find the floor not yet levelled.

Certificates you should receive at the end

A kitchen renovation creates paperwork that matters later. New circuits, outlets or hard-wired appliances must be installed by a registered electrician, who gives you a certificate of compliance and an electrical safety certificate; you can confirm a registration with the Electrical Workers Registration Board. The plumber's work is restricted work under its own licensing regime, and if the sink or dishwasher drainage moves, a building consent and a code compliance certificate may be needed from your council.

We keep every certificate with the job file and hand the set over at the end. If you sell the house, an insurer asks a question or a future owner opens a wall, that file answers it.

Demolition, disposal and living without a kitchen

Strip-out is the first day on site. The old cabinets, benchtop, tiles and any damaged flooring go into a skip we arrange, after the trades have isolated the water and power. Before that day we help you set up a temporary kitchen elsewhere in the house: the fridge, a microwave, a jug and a bench. We tell you which days the water will be off in that area and which days the kitchen circuits will be down, so you can plan meals.

Dust is managed with sealed doorways and extraction while linings come off, and the site is vacuumed each evening. A kitchen renovation is disruptive, but it should not take over the whole house.

How to compare kitchen renovators

Ask every renovator the same questions. Who is on site each day, and is that the person who quoted? Which trades are included in the price and which are shown as allowances? Who installs the cabinets, the joiner or the builder? Are floor levelling, disposal and painting in? What happens if a wall turns out to be load-bearing? A quote that answers those in writing is worth more than a lower number that does not.

Our quote lists the building work, the trades and the joinery separately, and jobs worth $30,000 or more come with the written contract the Building Act requires. Our guide to choosing kitchen renovators goes further.

Contact us about kitchen renovators for your project

Call Ethan on 022 621 5980, email ethan@westbeachconstruction.co.nz or send a message through the contact page with a photo of the current kitchen. If you already have a design from a kitchen company, send that too and we will quote the building work around it. We are available Monday to Friday, 7:30am to 5pm, and we visit and measure before quoting rather than pricing from a sketch.

Upper Hutt homeowners can also see our new kitchens in Upper Hutt page. If the kitchen is one part of a bigger job, our home renovators page explains how we run a whole-house renovation with the same single point of contact.

FAQS

Frequently Asked Questions

Do you supply the kitchen cabinetry?

We can introduce you to a joiner we work with, or install cabinetry from a kitchen company you have chosen. Either way we do the building work around it and coordinate the measure, installation and benchtop template so the two halves of the project meet properly.

Can you install a flat-pack kitchen I have bought?

Yes. Flat-pack cabinets rely on a level floor and straight walls, so the preparation matters more than with custom joinery. We prepare the room, assemble and install the units, scribe fillers where the room is out of square and fit the benchtop.

Who removes the old kitchen?

We do, including skip hire and disposal, and it is itemised in the quote. The plumber and electrician isolate the water and power before strip-out so nothing is disconnected by hand. Any flooring under the old units is checked and repaired at the same time.

What if a wall I want removed is load-bearing?

Then it needs an engineered beam and a building consent, which we arrange. We check the wall on the first visit by looking at the roof and floor framing, so you know before you settle on a layout whether it carries load and what that adds.

How long will I be without a kitchen?

Usually two to four weeks for a kitchen in the same footprint, and longer if a wall comes out. The water and power are off for only part of that time. We give you the dates before strip-out so you can plan around them.

Do you work with my architect or designer?

Yes. If you have drawings, we price from them and raise anything that will be hard to build before work starts. If you do not, we can sketch a layout with you and bring in a joiner to detail the cabinetry.

Ready to talk about your project? West Beach Construction is here to help.

See what our clients say about our service
Five star rating

One builder for the whole kitchen project

Bring your showroom design, your flat-pack boxes or just a photo of the old kitchen. We will quote the building work clearly and run every trade so you do not have to.