Renovation work in the right order, from structure to finish

A renovation changes what you already have. Done in the right sequence it costs less, takes less time and lasts longer.

A home renovation works within the footprint you already have, changing the layout, services and finishes of the existing house, where an extension adds floor area. Housing across the Wellington region runs from pre-war villas through 1960s weatherboard and 1970s brick and tile to 1990s plaster, and each era brings its own problems to a renovation.

West Beach Construction is based at Timberlea in Upper Hutt and renovates homes across the Hutt Valley, Wellington city, Porirua and the Kapiti Coast. Director Ethan Mansell quotes every job himself and is on site for the work. This page explains how home renovations run and what to decide before you start. For local detail see renovating a home in Wellington and renovations in Upper Hutt, and for the people side of the job, our page on what to expect from home renovators.

Call Ethan on 022 621 5980

Timber fence under construction beside a hillside home

What a home renovation can include

A renovation changes what you already have. Done in the right sequence it costs less, takes less time and lasts longer.

Layout changes

Removing or moving internal walls, closing off a doorway, combining a separate toilet and bathroom, or turning three small rooms into one living space. Load-bearing walls need a beam, engineering and a consent, which we organise.

Kitchens and bathrooms

The two rooms that carry the most trades and the most value, run as part of a wider renovation or on their own. See our pages on kitchen renovations and bathroom renovations for the detail of each.

Interior refits

New linings, insulation in the walls while they are open, new skirtings, architraves and doors, built-in storage, and painting. The work that makes a dated house feel new without touching the structure.

Structural and remedial repairs

Rotten bottom plates, borer-damaged framing, re-piling, failed flashings and past alterations that were never consented. We replaced a rotten bottom plate and basement floor in Hataitai in early 2026, typical of what an older house hides.

The order of work on a renovation

Every renovation follows the same sequence, and keeping it in order is most of what a builder adds. Structure first: any wall coming out, any beam going in, any floor or pile being replaced. Then services, because the plumber and electrician need open walls and ceilings. Then insulation and linings, which close everything up. Then the finishing trades: plastering, joinery, tiling, painting and floor coverings, each waiting on the one before.

Out of order is how renovations go wrong. A kitchen fitted before the electrician has finished means cabinets coming off the wall again. We write the programme around that sequence and book each trade for the day it is needed.

Staged renovations and living in the house

Not every renovation happens at once. Many clients renovate in stages: kitchen first, then bathroom, then living area. Staging works if each stage is planned with the next in mind, so the new kitchen is not cut into when a wall comes out later. We tell you what to rough in now and what to leave until later.

Most clients stay in the house while we work. We seal the work area off with dust walls, keep a bathroom and a kitchen running wherever the layout allows, and leave the site tidy each evening. Where a whole-house reline or a full re-pile makes staying impractical, we say so before you commit.

What older homes reveal once the linings come off

Any home built before 2000 may contain asbestos, most often in textured ceilings, vinyl floor backing and fibre cement soffits. We assume it is present until a sample says otherwise and follow the WorkSafe asbestos requirements for testing and removal before demolition starts. Pre-1980s paint is often lead-based, which changes how we sand and strip.

Behind the linings the usual finds are borer in untreated framing, rot where a shower or window has leaked for years, undersized lintels, and past alterations done without consent or a beam. We price older homes with a contingency for exactly this, and when something turns up the work pauses until you have seen it and approved the repair.

Consent, cost and time: what moves the numbers

For consent purposes renovation work falls into three groups. Like-for-like replacement and non-structural internal work are exempt under Schedule 1 of the Building Act. Removing a load-bearing wall, moving plumbing fixtures, adding a bathroom or enlarging windows needs a building consent from your council. The work in between needs a judgement call, which we make with the council before quoting.

On cost, the drivers are structure, how far plumbing and electrical move, the finish level you choose and what the house hides. On time, the lead items are joinery, windows and benchtops, and the consent itself. Settling your selections early is the biggest thing you can do to keep a renovation on programme.

Contact us about a home renovation

The most useful brief is a short one: which rooms, what is not working, a few photos, roughly when you want to start and whether you plan to stay in the house. From that we arrange a site visit, talk through the options and send a written quote that itemises structure, services, finishes and a contingency, so you can adjust the scope before anything starts. If you are weighing a renovation against adding floor area, our home extensions page covers the other side of that decision.

Call Ethan on 022 621 5980, email ethan@westbeachconstruction.co.nz or send the details through our contact page. We are open Monday to Friday, 7:30am to 5pm.

FAQS

Frequently Asked Questions

How long does a home renovation take?

It depends on how much structure and plumbing moves. A single-room refit is usually a few weeks on site, opening up a living area with a beam takes longer, and a whole-house renovation can run for months. The quote comes with a programme so you know before you commit.

What is the difference between a renovation and an extension?

A renovation changes the house within its existing walls and roof: layout, services, linings and finishes. An extension adds floor area, which always needs a building consent plus new foundations and roof. Many projects combine the two, and we price them as separate parts so you can see which is which.

Do I need a building consent to renovate?

Not for like-for-like replacement or non-structural internal work. You do for structural changes, moved plumbing, a new bathroom or any change to the building envelope. We confirm which applies with your council before we quote, and we handle the builder side of the application and the inspections.

Can I renovate in stages?

Yes, and many clients do. The key is planning each stage with the next one in mind so nothing new is cut into later. We tell you what to rough in now, such as drainage for a future ensuite, and what can safely wait until the next stage.

What if you find asbestos or rot?

We expect both in older homes and quote with a contingency. Suspected asbestos is sampled and, if confirmed, removed in line with WorkSafe requirements before demolition continues. Rot and borer are shown to you and priced before the repair goes ahead, so there are no surprises on the invoice.

Where do you renovate?

Across the Wellington region from our base at Timberlea in Upper Hutt: Upper Hutt, Lower Hutt, Wellington city, Porirua and the Kapiti Coast. Travel is built into the quote. We also have dedicated pages for renovations in Wellington city and in Upper Hutt.

Ready to talk about your project? West Beach Construction is here to help.

See what our clients say about our service
Five star rating

Start your home renovation with a site visit

Tell us which rooms you want to change and what is not working, and we will come and look. You get a written, itemised quote and a programme, and the decision stays with you.