Home extensions across the Wellington region: rear single storey extensions, second storey additions, sunrooms and garage conversions, taken from first sketch through council consent to a finished room that reads as part of the original house. Built by West Beach Construction from our base in Upper Hutt.

Business Hours

Monday - Friday: 7:30am - 5pm

Service Area

Wellington Region

Contact

More room, built onto the house you already own

An extension is the right answer when the layout works but the house is simply too small for the people in it.

An extension adds floor area to an existing house. It is the biggest building project most homeowners take on, because it combines everything a new build involves, foundations, framing, roof, cladding and services, with the complication of joining it all to a house that is already there. Done well, the join disappears and the house feels as if it was always that size. Done badly, it looks bolted on and leaks at the junction.

West Beach Construction builds home extensions across Upper Hutt, Lower Hutt, Wellington city, Porirua and the Kapiti Coast. This page covers the types of extension, the design and consent timeline, the council rules that decide what fits on your section and the building decisions that matter most. For local detail see extensions in Wellington and extending a home in Upper Hutt; for working with the builder, see home extension builders.

Call Ethan on 022 621 5980

Foundation slab and plumbing ready for a new build

Types of home extensions we build

An extension is the right answer when the layout works but the house is simply too small for the people in it.

Rear single storey extension

The most common and usually the most economical: extending across the back or side at ground level for a larger kitchen and living area, a main bedroom with ensuite, or a family room opening onto a deck.

Second storey addition

Building up when the section cannot take more footprint, or to reach the sun and the view. It needs engineering for the existing walls and foundations and more roof work, so it costs more per square metre.

Sunroom or conservatory

A smaller, glazed, sun-facing room off the living area. Less floor area than a full extension but a large change to how the house feels in a Wellington winter, provided the glazing and ventilation are specified properly.

Garage, sleepout and minor dwelling conversions

Turning existing space into a habitable room means insulation, lining, ventilation, often a bathroom, and a consent. A self-contained minor dwelling has further district plan rules on size and parking, which we check first.

Design, consent and build: the timeline

An extension runs in three stages. Design first: a designer or architect draws it, an engineer sizes the beams, foundations and any work to the existing structure, and we feed in buildability and cost while the drawings are still cheap to change. Then consent: drawings, engineering and specifications go to your council, which has 20 working days to process a complete application, though a request for further information stops that clock. Then the build.

Design and consent together usually take a few months; the build depends on size and whether it goes up or out. We give you a programme at quote stage and update it as the consent comes through.

District plan rules that decide what fits

Three district plan rules decide what can go where. Site coverage caps how much of the section can be built on. Height in relation to boundary limits how tall a wall can be close to the neighbour, which usually shapes a second storey. Setbacks keep the extension a set distance from boundaries. Break any of them and you need a resource consent as well as a building consent, which adds months.

We check the rules on the first visit. In Wellington city the council's consents pages set out both processes; Hutt City, Upper Hutt, Porirua and Kapiti each have their own plan and their own numbers.

Foundations, engineering and the junction with the old house

Ground across the region runs from rock on the hills to soft alluvial soil on the valley floor and sand on the coast, and the foundation design follows the ground. An engineer specifies piles, a slab or a mix; on a sloping section retaining and drainage come first. A second storey adds a further question: whether the existing foundations and walls can carry the new load, and what needs strengthening if they cannot.

The junction is where extensions fail. The new roof has to flash into the old one, the new floor has to meet the old floor level, and the cladding has to tie in without a visible line. We plan all three before the quote.

Matching the old house and staying weathertight

An extension should not announce itself from the street. We match cladding profiles, roof pitch and material, window proportions and joinery colour. Inside, floor levels, skirting heights and door styles carry through so the join is invisible.

While the build is on, the existing house stays occupied. We open the old wall as late as possible, weatherproof the junction at the end of each day and keep dust and noise to the work area. Where the roof comes off for a second storey we plan the sequence around the forecast. If you are still deciding whether to build or move, our guide on whether to extend or move works through the trade-offs.

Contact us about a home extension

The earlier we see the section, the better the extension. Send us the address, a few photos and what you want the new space to do, and we will visit, check the district plan rules and give you a realistic idea of scope and sequence. If you already have drawings, send those and we will price them. A new deck often goes in with an extension so the floor levels line up; see our timber decks page. We work across Upper Hutt, Lower Hutt, Wellington city, Porirua and the Kapiti Coast.

Call Ethan on 022 621 5980, email ethan@westbeachconstruction.co.nz or use the contact form. We are open Monday to Friday, 7:30am to 5pm.

FAQS

Frequently Asked Questions

How long does a home extension take?

Design and consent usually take a few months before anything happens on site, and the build depends on size and whether it goes out or up. A single storey extension is quicker than a second storey, which needs more engineering and roof work. The quote comes with a programme.

Does every extension need a building consent?

Yes. Adding floor area is never exempt work. If the extension also breaks a district plan rule such as site coverage or height in relation to boundary, a resource consent is needed as well. We check both on the first visit so you know before design starts.

Should I build out or up?

Out is usually simpler and cheaper per square metre if the section has room and the district plan allows it. Up makes sense on a small section, or where the sun and view are upstairs. Up needs engineering for the existing structure and more disruption while the roof is open.

Can we live in the house during the build?

Almost always for a single storey extension, since the old wall stays closed until late in the job. A second storey depends on how much roof comes off and for how long; we plan the sequence with you and say honestly which weeks will be difficult.

Will the new part match the old?

That is the aim. Cladding profile, roof pitch, window proportions, joinery colour and internal floor levels are all matched, and on older homes we source non-standard profiles rather than approximate them. The test is whether a visitor can tell where the old house stops.

Do you do the design?

No. The drawings come from a designer or architect, either one we work with or your own, and the engineering from a structural engineer. What we add is builder input while the design is still on paper, so the extension is buildable and the price is realistic before consent.

Ready to talk about your project? West Beach Construction is here to help.

See what our clients say about our service
Five star rating

Planning a home extension? Get a builder in early

Send us the address, a few photos and the problem you are trying to solve. We will visit, check what the section allows, and give you a straight answer on scope and sequence before you spend money on drawings.