Why the builder belongs in the room at design stage
The cheapest change to an extension is the one made on paper, and that only happens if the builder is asked.
Most extensions are designed, consented and only then put out to builders for a price. By then the drawings are fixed, the consent fee is paid and every change costs money. The alternative is to bring home extension builders in at the sketch stage, so the roof junction, the floor level, access and the foundation type are decided while they are still lines on a page. We price more accurately that way, and the result is usually simpler to build.
West Beach Construction is a locally owned company based at Timberlea in Upper Hutt, run by director Ethan Mansell and a member of New Zealand Certified Builders. This page explains what an extension builder does across the project, how we price and what to ask before you commit. For the extension itself, see our home extensions page; for a planning checklist, read our guide on planning an addition with your builder.
Call Ethan on 022 621 5980

What an extension builder does on your project
The cheapest change to an extension is the one made on paper, and that only happens if the builder is asked.
Buildability and cost input before consent
We read the sketch for things that will be hard or expensive to build, such as a roof that cannot drain or a floor that misses the old level, and suggest the cheaper version while it is still a drawing.
Coordinating designer, engineer and council
The designer draws, the engineer calculates, the council inspects. We keep all three on the same page, chase the information requests that stop the consent clock, and book each inspection at the right stage.
Managing the build and the trades
Foundations, framing, roof, cladding, joinery, plumbing, electrical, linings and finishing, each trade booked in sequence by us, with the programme updated as the job moves and the existing house kept weathertight throughout.
Closing out the consent
A consent is not finished when the builder leaves. The final inspection, the engineer's producer statements and the code compliance certificate all have to be lodged and issued, and we see that through.
How extension builders price, and what the words mean
A fixed price covers the work shown on the drawings and specifications. Where an item has not been chosen yet, such as the kitchen or tiles, the quote carries a prime cost sum, an allowance adjusted when you decide. Where the amount of work cannot be known until the ground is opened, it carries a provisional sum, an estimate replaced by the actual cost. A variation is any change to scope after signing, priced and approved in writing before it happens.
Two builders quoting the same drawings can differ a great deal depending on what sits in the allowances and what is left out, so ask for the allowances and exclusions as a list.
Licensing, contracts and who is responsible for what
An extension is restricted building work, so the structural and weathertightness parts must be carried out or supervised by a Licensed Building Practitioner. You can check any licence on the LBP register for homeowners. Because most extensions cost more than $30,000, a written contract with a disclosure statement and checklist is required by law, and the Building Act implied warranties and 12-month defect repair period apply whether the contract mentions them or not.
What we do not do is design. Drawings come from a designer or architect and calculations from an engineer. What we do is build what they drew, say early if it cannot be built as drawn, and own the result.
Programme, weather and keeping the house usable
The programme for an extension is written backwards from the joinery and roofing lead times, because the shell must be closed in before finishing starts. We order long-lead items when the contract is signed and aim to have the roof on and cladding fixed before the worst of the winter. Wellington weather does not read programmes, so the plan carries float rather than a date we cannot hold.
The existing house stays in use. The opening between old and new is made as late as possible and sealed each night, services are switched over in a planned window, and you hear the day before anything noisy or dusty.
Questions to ask any extension builder
Ask who holds the licence and who will be on site each day. Ask to see a recent extension, ideally a year or two old, to see how the junction has weathered. Ask how allowances and variations are priced and whether the contract is a standard industry form. Ask how the existing house is kept weathertight when the wall comes out.
Then ask about them. How many jobs run at once, and whether yours will have a builder on it every day or be visited between others. A long answer to that question is usually more honest than a short one. Our builders in Wellington page sets out how we work across the city.
Contact us about your extension
If you have a sketch, send it. If you only have a problem, send that with the address and a few photos. Either way we will visit, look at the section and the existing house, and tell you what the extension will involve before you commit to drawings. A home extension is usually the biggest job a household takes on, and the first conversation costs nothing. We work across Upper Hutt, Lower Hutt, Wellington city, Porirua and the Kapiti Coast.
Call Ethan on 022 621 5980, email ethan@westbeachconstruction.co.nz or send the details through the contact page. Hours are Monday to Friday, 7:30am to 5pm.
FAQS
Frequently Asked Questions
Before the drawings are finished. A builder reading the sketch can flag a roof that will not drain, a beam that needs a crane or a floor level that will not meet the old one, while those are still cheap to change. After consent, every change costs money and time.
No. Design is done by a designer or architect and the structure by an engineer, each responsible for their own work. The builder prices and builds what they drew. We work alongside designers we know, or with your own architect, and give buildability input either way.
An estimate for work whose extent cannot be known until the job is under way, such as foundations where the ground has not been opened. It is replaced by the actual cost. A prime cost sum is different: an allowance for an item you have not chosen yet, such as tapware.
We prepare the builder side of the consent application, respond to requests for further information with the designer and engineer, book every inspection and lodge the paperwork for the code compliance certificate at the end. You are kept informed but you are not the one chasing council.
Ask for their Licensed Building Practitioner number and licence class, then look it up on the public LBP register. Restricted building work on an extension must be done or supervised by a licensed practitioner, who signs a record of work when the job is complete.
Yes. Send us the consented or draft drawings and we will price them. If we see something that will be difficult or expensive to build as drawn, we say so before quoting rather than discovering it on site.
Ready to talk about your project? West Beach Construction is here to help.
See what our clients say about our service
Get extension builders involved before the drawings are done
Send us a sketch or just the problem, with the address and a few photos. We will visit, read the section, and tell you what the extension will involve before you pay for drawings.