Getting the layout right before the tiles go on
The decisions that matter most in a bathroom are made on paper, before a single fixture is ordered or a wall is opened.
A bathroom is the smallest room most people renovate and the one with the least room for error. Water, electricity, drainage, ventilation and heavy finishes share a few square metres, and once the tiles are on, changing your mind means starting again. That is why we settle the layout and the specification first. West Beach Construction renovates bathrooms of every kind: the original family bathroom in a 1970s house, a cramped ensuite that needs to earn its space, a second bathroom for teenagers, or a level-entry room for someone who needs to keep showering safely at home.
This page explains the layouts, materials and process in general terms. For local detail see bathroom renovations in Wellington and renovating a bathroom in Upper Hutt, and to see who does what on site, read about our approach as bathroom renovators.
Call Ethan on 022 621 5980

Bathroom layouts we build
The decisions that matter most in a bathroom are made on paper, before a single fixture is ordered or a wall is opened.
Three-piece and four-piece bathrooms
A shower, toilet and vanity is the standard three-piece layout. Adding a bath makes it four-piece, which suits young families if the room can keep the shower a proper size.
Ensuites and second bathrooms
An ensuite usually comes out of a wardrobe or a corner of the main bedroom. Drainage is the challenge: a toilet needs fall to the existing stack, so where it can go decides the plan.
Wet rooms and level-entry showers
A fully tiled room with a floor that falls to a central or linear drain. No tray, no step and nothing to trip on, which is why we build these for older owners.
Accessible bathrooms
Wider door openings, a level-entry shower with a fold-down seat, grab rails fixed into blocking behind the lining and a vanity you can sit at. Planned now, they save a second renovation later.
Materials: tiles, acrylic linings, vanities and tapware
Tiles give you the widest choice of look and last for decades, but they rely on the waterproofing beneath them and the grout between them. Acrylic shower linings and wall panels cost less, go in faster and have no grout to maintain, a sensible choice for a rental or a second bathroom.
Vanities range from wall-hung units that make a small floor look bigger to floor-standing cabinets with more storage. Tapware is worth spending on, because a cheap mixer is usually the first thing to fail. A heated towel rail, a lit mirror cabinet and an underfloor heating mat are small additions that change how the room feels on a winter morning.
Waterproofing and ventilation are where bathrooms fail
Everything you see in a finished bathroom sits on something you cannot see. The membrane under the tiles has to meet clause E3 of the Building Code, which sets the rules for keeping water out of the framing; the requirements are on the building.govt.nz page for E3 internal moisture. We apply membrane systems to the manufacturer's specification, including the curing time between coats and before tiling, because rushing that step is how a new bathroom leaks into the hallway two winters later.
Ventilation matters just as much. Clause G4 requires moisture to be removed from the room, and the way to do that is a ducted extractor fan that vents outside, not into the ceiling space, sized for the room and ideally on a run-on timer.
Lighting, heating and the small comforts
Bathrooms are often lit by one ceiling fitting that leaves your face in shadow at the mirror. A renovation is the chance to fix that with a mirror light or wall lights at face height, a brighter fitting over the shower and a switch layout that makes sense, all installed by a registered electrician who issues a certificate of compliance.
Heating is the comfort people forget until winter. The options are a heated towel rail, an underfloor heating mat under the tiles, or a combined heater, fan and light unit. Underfloor heating goes in before the tiles, so it is a decision for the planning stage, not an afterthought.
How the renovation runs on site
A full bathroom renovation is usually two to three weeks on site. Day one is strip-out and disposal. The plumber and electrician then rough in the new pipework and cables while the walls are open, which is also when we replace any rotten framing or flooring. Next come new linings, the waterproofing with its curing days, then tiling and grouting. Fit-off follows: vanity, toilet, shower screen, tapware, rail and mirror. Painting and a final clean finish the job.
If fixtures stay where they are, the work is usually exempt from building consent. Moving the toilet or shower changes the drainage and normally needs consent, and adding a bathroom always does. We confirm this with your council before quoting.
Contact us about your bathroom renovation
The best starting point is a look at the room and a conversation about what is not working. Send a couple of photos and your address through the contact page, or call Ethan on 022 621 5980. You can also email ethan@westbeachconstruction.co.nz. We are available Monday to Friday, 7:30am to 5pm, and we will arrange a site visit and a written, itemised quote.
The same team handles everything from kitchen renovations to full home renovations in Wellington. Read our guide on managing moisture and ventilation in a Wellington bathroom for more detail on that side of the job.
FAQS
Frequently Asked Questions
A full renovation of a standard bathroom is usually two to three weeks on site once the fixtures and tiles are on hand. Layout changes, new drainage or rot repair add time. Ordering fixtures early is the single biggest factor in keeping the programme short.
Not if the fixtures stay in the same positions and no structure changes. Moving a toilet or shower alters the drainage and normally needs consent, and a new bathroom or ensuite always does. We check with your council before we quote so there are no surprises.
Neither is better in every case. Tiles offer more choice and a longer life but depend on good waterproofing and grout maintenance. Acrylic linings are quicker, cost less and have no grout. Many clients tile the floor and feature wall and use an acrylic shower lining.
Usually, yes. The deciding factor is drainage: a new toilet needs enough fall to reach the existing drain, which is easier on a timber floor than on a concrete slab. We check the subfloor and the drain position on the first visit before suggesting a layout.
In an older home it is common, especially around the shower and under the bath. We allow a contingency for it in the quote, show you what we find and price the repair before carrying on, so there is no surprise on the final invoice.
Across Upper Hutt, Lower Hutt, Wellington city, Porirua and the Kapiti Coast, from our base at Timberlea in Upper Hutt. Travel is built into the quote rather than added later, and we schedule coast jobs in blocks of consecutive days.
Ready to talk about your project? West Beach Construction is here to help.
See what our clients say about our service
Ready to plan a bathroom that works?
Send us a photo of the room and a note on what you want to change. We will visit, measure, talk through layouts and materials, and send a clear written quote.